FEATURED PROJECTS

 

 

PROJECT NAME:

Sea-Tac 3rd. Runway Embankment

 


LOCATION:
Sea-Tac, WA

 


OWNER:
Port of Seattle

 


DESCRIPTION:

Scarsella Bros. performed work under three contracts for Sea-Tac’s third runway, a project which required more than 16 Million Cubic Yards of fill material and three Mechanically Stabilized Earth Walls – one of which was the tallest built in the Western Hemisphere. Scarsella’s work includes: Round-the-Clock operation of a large fleet of heavy hauling trucks importing fill material, on-site excavation and earthmoving, as well as mining and manufacturing of gravel materials. Sea-Tac’s third runway remains one of the most challenging public works projects ever undertaken in the State of Washington.

 


LINKS:

 

http://www.djc.com/special/ThirdRunway/

http://www.djc.com/news/co/12000280.html

http://www.djc.com/news/co/12000279.html

http://www.djc.com/news/co/12000281.html